Commissioning
• Develop the "Prepare to Operate" work strategy.
• Develop "Management Control Diagram".
• Synchronize construction turnover packages with commissioning / operations schedule.
• Determine commissioning schedule.
• Planning / Scheduling.
• Evaluate progress.
• Develop detailed Commissioning Procedures.
• Develop mechanical equipment troubleshooting guides.
• Plan / Schedule Start-up.
• Act as owner's representative with EPC contractor(s).
• Document control system.